VeriBuild.in
VeriBuild / Services / Civil Work Audit
SERVICE 01 · STRUCTURE

Civil Work Audit

We verify structural work against your approved drawings and applicable code, before it disappears behind plaster and paint — footings, columns, beams, slabs, shuttering and curing.

What we check

The specific checkpoints covered under this audit.

How this audit runs

A fixed, transparent process for this specific service.

1
01

Drawing review

We review your structural drawings, design basis and applicable code requirements before the visit.

2
02

Site inspection

An engineer inspects exposed reinforcement, formwork and pour quality at the relevant stage.

3
03

Photo documentation

Every checkpoint is photographed with a clear pass or flag, plus measurements where relevant.

4
04

Findings report

A structured report ranks flagged items by severity, so you know what to raise with your contractor first.

Other audits

This is one of six checks VeriBuild covers — mix and match to fit your build.

GET STARTED

Book a civil work audit

Share your address, drawings and BOQ and we'll confirm a fixed-fee quote.

Get a quote